Job 3

“Cave In.” A roofing truck drove over and into the existing septic tank. The job involved removing the destroyed and unusable existing tank, and installing a completely new system.

  1. 4×8 sheets of plywood covering the crushed septic tank.
  2. Another view of the caved-in existing system.
  3. 3&4 – Open excavation with a 500 gpd (gallons-per-day) packaged aerobic septic system installed.
  4. Post-installation protective landscaping consisted of several large stones placed around the new septic system, in order to prevent future vehicular traffic over the new installation.
  5. The finished job.